Skip to main content
Completed and ongoing projects in year 2012
- Piles testing. Klaipėda Heat and Power plant. Kretainio St. 3, Klaipėda
- Wastewater treatment facilities in hotel "Le Meridien Vilnius" territory. A2 HWY, 19th kilometer, Vilnius Region.
- Recreation facility. 2nd stage. L.Asanavičiūtės St.13a, Vilnius.
- Klaipėda sludge treatment facilities. Underground storage capacity.
- Heat and power plant. Pramonės St. 11, Utena.
- Storage building. S.Darius ir S.Girėno St. 81, Vilnius.
- Alytus sludge treatment facilities. Putinų St. 82A, Alytus.
- Social housing building in Linksmoji St. construction. Vilnius.
- Food preparation shop. Rodūnos Rd 2, Vilnius.
- Apartment house. Mindaugo St. 27/27A, Vilnius.
- Ignalina Nuclear Power Plant spent fuel temporary storage facility B1.
- Multi-storey car park. Rodūnos Rd 3, Vilnius.
Completed projects in year 2011
- Single-detached dwelling house (without garage). Kryžokų Countryside, Vilnius Region.

- Administration building (8.2), J.Balčikonio St. 3, Vilnius.
- Trans-European network E85 road (Vilnius–Kaunas–Klaipėda) reconstruction. Section via Grigiškės reconstruction (2nd stage).
- Overhead road Kaunas–Palanga, construction at the Jakų intersection (Riga–Kaunas direction).
- Klaipeda Seaport berths No.8 and No.9 reconstruction, pile testing.
- Vilkaviškio elevator. Bučiūnų Countryside., Vilkaviškis Region.
- Bulk cargo terminal. Nemuno St. 24, Klaipėda.
- Production laboratory and warehouse construction. Šilutės HWY, Klaipėda.
- Road No.229 Aristava–Kėdainiai–Cinkiškės. Bridge over Šešupė reconstruction.
- Klaipėda Heat and Power plant. Kretainio St. 3, Klaipėda
- Administration building with commercial facilities collector. Sporto St. 16, Vilnius.
- Road No. 120 Antakalnis–Jieznas–Merkinė 26.45-26.70 km section reconstruction.
- Kirtimų St., Southern Bypass, Vilnius.
- Multi-Apartment Residential Houses “Eglių Terasos“. 1st construction stage. Nemenčinės HWY.
- Detached house. Gaidžiabūdės St. 11, Vilnius.